Machine-room-less (MRL elevator) designs eliminate dedicated machine rooms but impose tighter shaft, pit, and overhead constraints than conventional layouts.
Never assume passenger shaft rules from outdated non-MRL datasheets. Request current GA drawings for each load/speed class from your supplier.

Provide structural engineers with rail reaction forces. Discuss maintenance platform requirements — some jurisdictions impose additional MRL rules.

Engage RITECH early for MONADRIVE-compatible RTE platforms and verify pit/overhead before concrete pours.